All airlines flying from Ministro Pistarini, Buenos Aires (EZE) to San Carlos Bariloche (BRC).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 11:05 Ministro Pistarini, Buenos Aires (EZE) P 13:30 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1322 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective 2025-07-05 through 2025-07-26
Thu,Sun 03:35 Ministro Pistarini, Buenos Aires (EZE) P 06:00 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1660 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-09-04 through 2025-10-26
Sat 03:30 Ministro Pistarini, Buenos Aires (EZE) P 05:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective from 2026-02-07
Thu,Sun 03:45 Ministro Pistarini, Buenos Aires (EZE) P 06:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Valid until 2025-06-29
Tue,Thu,Sun 03:45 Ministro Pistarini, Buenos Aires (EZE) P 06:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-01 through 2025-07-31
Sat 03:45 Ministro Pistarini, Buenos Aires (EZE) P 06:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective 2025-07-05 through 2025-07-26
Tue,Thu,Sat,Sun 03:45 Ministro Pistarini, Buenos Aires (EZE) P 06:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-08-02 through 2025-08-31
Sun 04:05 Ministro Pistarini, Buenos Aires (EZE) P 06:30 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Effective from 2026-02-01
Mon,Fri 04:30 Ministro Pistarini, Buenos Aires (EZE) P 06:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-09-01 through 2025-10-24
Mon,Fri 04:30 Ministro Pistarini, Buenos Aires (EZE) P 06:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Effective from 2026-02-02
Wed 08:45 Ministro Pistarini, Buenos Aires (EZE) P 11:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1662 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2025-05-21
Thu,Sun 03:35 Ministro Pistarini, Buenos Aires (EZE) P 06:00 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1664 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-10-30 through 2026-01-29
Thu 03:35 Ministro Pistarini, Buenos Aires (EZE) P 06:00 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1664 Non-stop Boeing 737-800 (738) 2:25 Effective from 2026-02-05
Mon,Fri 04:30 Ministro Pistarini, Buenos Aires (EZE) P 06:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1664 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-10-27 through 2026-01-30
Mon 04:45 Ministro Pistarini, Buenos Aires (EZE) P 07:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1664 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-07 through 2025-07-28
Mon,Fri,Sun 04:45 Ministro Pistarini, Buenos Aires (EZE) P 07:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1664 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-08-01 through 2025-08-31
Mon 05:45 Ministro Pistarini, Buenos Aires (EZE) P 08:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1666 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-05-05 through 2025-05-26
Tue,Sun 05:45 Ministro Pistarini, Buenos Aires (EZE) P 08:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1666 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-01 through 2025-08-31
Tue,Thu-Sat 06:30 Ministro Pistarini, Buenos Aires (EZE) P 08:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1666 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-09-02 through 2026-01-31
Thu 06:35 Ministro Pistarini, Buenos Aires (EZE) P 09:00 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1666 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective from 2026-02-05
Thu 06:45 Ministro Pistarini, Buenos Aires (EZE) P 09:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1668 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-08-07 through 2025-08-28
Mon 07:30 Ministro Pistarini, Buenos Aires (EZE) P 09:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1668 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective 2025-09-01 through 2026-01-26
Mon 07:30 Ministro Pistarini, Buenos Aires (EZE) P 09:55 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1668 Non-stop Boeing 737-800 (738) 2:25 Effective 2026-02-09 through 2026-02-16
Wed 07:45 Ministro Pistarini, Buenos Aires (EZE) P 10:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1668 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-02 through 2025-07-30
Fri 06:45 Ministro Pistarini, Buenos Aires (EZE) P 09:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-800 (738) 2:25 Valid until 2025-05-02
Fri 06:45 Ministro Pistarini, Buenos Aires (EZE) P 09:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-200 Combi (73M) 2:25 Operates only on 2025-05-09
Fri 06:45 Ministro Pistarini, Buenos Aires (EZE) P 09:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-05-16 through 2025-05-30
Fri 06:45 Ministro Pistarini, Buenos Aires (EZE) P 09:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective 2025-06-06 through 2025-07-25
Mon 06:45 Ministro Pistarini, Buenos Aires (EZE) P 09:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-07 through 2025-07-28
Thu 07:45 Ministro Pistarini, Buenos Aires (EZE) P 10:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-03 through 2025-07-31
Sun 09:35 Ministro Pistarini, Buenos Aires (EZE) P 12:00 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective from 2026-02-01
Tue 09:40 Ministro Pistarini, Buenos Aires (EZE) P 12:05 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1670 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective 2025-09-02 through 2026-01-27
Mon 09:45 Ministro Pistarini, Buenos Aires (EZE) P 12:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1672 Non-stop Boeing 737-800 (738) 2:25 Valid until 2025-05-05
Mon 09:45 Ministro Pistarini, Buenos Aires (EZE) P 12:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1672 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective 2025-05-12 through 2025-05-26
Mon,Wed 09:45 Ministro Pistarini, Buenos Aires (EZE) P 12:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1672 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-05-28 through 2025-06-02
Mon 09:45 Ministro Pistarini, Buenos Aires (EZE) P 12:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1672 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-06-09 through 2025-06-30
Mon,Wed 09:45 Ministro Pistarini, Buenos Aires (EZE) P 12:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1672 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-02 through 2025-08-27
Sat 10:40 Ministro Pistarini, Buenos Aires (EZE) P 13:05 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1672 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-09-06 through 2026-01-31
Sat 10:50 Ministro Pistarini, Buenos Aires (EZE) P 13:15 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1674 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2025-05-31
Mon 11:45 Ministro Pistarini, Buenos Aires (EZE) P 14:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1674 Non-stop Boeing 737-200 Combi (73M) 2:25 Operates only on 2026-02-02
Mon 11:45 Ministro Pistarini, Buenos Aires (EZE) P 14:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1674 Non-stop Boeing 737-200 Combi (73M) 2:25 Effective from 2026-02-16
Tue 11:45 Ministro Pistarini, Buenos Aires (EZE) P 14:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1676 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-01 through 2025-07-29
Thu 13:45 Ministro Pistarini, Buenos Aires (EZE) P 16:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1676 Non-stop Boeing 737-800 (738) 2:25 Effective from 2026-02-05
Fri 12:55 Ministro Pistarini, Buenos Aires (EZE) P 15:20 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1678 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2025-06-06
Wed 13:45 Ministro Pistarini, Buenos Aires (EZE) P 16:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1678 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2025-05-28
Tue 13:45 Ministro Pistarini, Buenos Aires (EZE) P 16:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1678 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-08-05 through 2025-08-26
Tue 13:45 Ministro Pistarini, Buenos Aires (EZE) P 16:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1678 Non-stop Boeing 737-800 (738) 2:25 Effective from 2026-02-03
Sun 13:45 Ministro Pistarini, Buenos Aires (EZE) P 16:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1680 Non-stop Boeing 737-800 (738) 2:25 Effective 2025-07-06 through 2025-07-27
Sun 12:45 Ministro Pistarini, Buenos Aires (EZE) P 15:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1682 Non-stop Boeing 737-800 (738) 2:25 Operates only on 2025-05-04
Thu 08:45 Ministro Pistarini, Buenos Aires (EZE) P 11:10 San Carlos Bariloche (BRC)
Aerolineas Argentinas AR 1684 Non-stop Boeing 737-800 (738) 2:25 Valid until 2025-05-29
Ad flat here 8924483383 I FlightInfo Lower
Parallax here EZE-BRC
1 2 3 4 5 6 7   next


All airlines flying from Ministro Pistarini, Buenos Aires (EZE) to San Carlos Bariloche (BRC).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2025-07-05 through 2025-07-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-09-04 through 2025-10-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Valid until 2025-06-29
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-01 through 2025-07-31
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-05 through 2025-07-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-08-02 through 2025-08-31
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-09-01 through 2025-10-24
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-02
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-21
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-10-30 through 2026-01-29
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-05
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-10-27 through 2026-01-30
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-07 through 2025-07-28
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-08-01 through 2025-08-31
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-05-05 through 2025-05-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-01 through 2025-08-31
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-09-02 through 2026-01-31
Mon
-
Tue
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-05
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-08-07 through 2025-08-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-09-01 through 2026-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2026-02-09 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-02 through 2025-07-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Valid until 2025-05-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-05-16 through 2025-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-06-06 through 2025-07-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-07-07 through 2025-07-28
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-03 through 2025-07-31
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-09-02 through 2026-01-27
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Valid until 2025-05-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-05-12 through 2025-05-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-05-28 through 2025-06-02
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-06-09 through 2025-06-30
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-02 through 2025-08-27
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-09-06 through 2026-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2026-02-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective from 2026-02-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-07-01 through 2025-07-29
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-05
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2025-06-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-28
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-08-05 through 2025-08-26
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective from 2026-02-03
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)

Effective 2025-07-06 through 2025-07-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (738)

Valid until 2025-05-29
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (738)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here EZE-BRC
Page 1 / 7        next
  • A domestic route departing from the Ministro Pistarini, Buenos Aires airport (EZE) and arriving at San Carlos Bariloche airport (BRC).
  • The flight distance is 813 miles, or 1309 km.
  • The timezone of both the departure and the arrival airports is UTC-3 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 2:10 and 2:25.