All airlines flying from Chania (CHQ) to Budapest (BUD).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Fri 17:50 Chania (CHQ) 19:10 Budapest (BUD) 2B
Ryanair FR 187 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective from 2025-06-06
Wed 20:45 Chania (CHQ) 21:55 Budapest (BUD) 2B
Ryanair FR 187 Non-stop Boeing 737-800 (73H) 2:10 Effective from 2025-06-04
Sun 21:40 Chania (CHQ) 23:00 Budapest (BUD) 2B
Ryanair FR 187 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2025-06-01
Tue 09:00 Chania (CHQ) 10:20 Budapest (BUD)
Smartwings Hungary 7O 5009 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-06-03
This is a Charter flight.
Tue 09:00 Chania (CHQ) 10:20 Budapest (BUD)
Smartwings Hungary 7O 5009 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-06-10 through 2025-09-30
This is a Charter flight.
Sun 22:35 Chania (CHQ) 23:55 Budapest (BUD)
Smartwings Hungary 7O 5033 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-06-15 through 2025-09-28
This is a Charter flight.
Sun 16:20 Chania (CHQ) 17:40 Budapest (BUD)
Smartwings Hungary 7O 5043 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-06-01 through 2025-10-12
This is a Charter flight.
Sun 09:30 Chania (CHQ) 10:50 Budapest (BUD)
Smartwings Hungary 7O 5093 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-06-15 through 2025-09-28
This is a Charter flight.
Ad flat here 8924483383 I FlightInfo Lower
Parallax here CHQ-BUD


All airlines flying from Chania (CHQ) to Budapest (BUD).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

17:50

19:10
Effective from 2025-06-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

20:45

21:55
Effective from 2025-06-04
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

21:40

23:00
Effective from 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-06-03
This is a Charter flight.
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-10 through 2025-09-30
This is a Charter flight.
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-06-15 through 2025-09-28
This is a Charter flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-06-01 through 2025-10-12
This is a Charter flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-06-15 through 2025-09-28
This is a Charter flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-800 (73H)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here CHQ-BUD
  • An international route departing from Chania airport, Greece (CHQ) and arriving at Budapest airport, Hungary (BUD).
  • The flight distance is 860 miles, or 1384 km.
  • The timezone of the departure airport is UTC+2 , and the timezone of the arrival airport is UTC+1 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:10 and 2:20.