All airlines flying from Birmingham (BHM) to Midway, Chicago (MDW).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue,Wed 15:30 Birmingham (BHM) 17:20 Midway, Chicago (MDW)
Southwest Airlines WN 404 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Valid until 2025-06-04
Sun 17:45 Birmingham (BHM) 19:40 Midway, Chicago (MDW)
Southwest Airlines WN 404 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2025-05-25
Sun 17:55 Birmingham (BHM) 19:45 Midway, Chicago (MDW)
Southwest Airlines WN 404 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2025-05-18
Sun 17:55 Birmingham (BHM) 19:45 Midway, Chicago (MDW)
Southwest Airlines WN 404 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-06-01
Thu 10:55 Birmingham (BHM) 12:45 Midway, Chicago (MDW)
Southwest Airlines WN 496 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Operates only on 2025-11-27
Mon,Thu,Fri 17:30 Birmingham (BHM) 19:20 Midway, Chicago (MDW)
Southwest Airlines WN 737 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 17:30 Birmingham (BHM) 19:20 Midway, Chicago (MDW)
Southwest Airlines WN 737 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-07-07 through 2025-08-04
Mon,Thu,Fri,Sun 06:20 Birmingham (BHM) 08:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 06:20 Birmingham (BHM) 08:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-11-21 through 2025-11-28
Fri,Sun 06:20 Birmingham (BHM) 08:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-12-07 through 2025-12-14
Thu 06:20 Birmingham (BHM) 08:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-12-18
Mon 06:20 Birmingham (BHM) 08:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2026-01-05
Sat 07:10 Birmingham (BHM) 09:00 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-11-08 through 2025-11-15
Sat 07:10 Birmingham (BHM) 09:00 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-12-06 through 2025-12-13
Tue,Wed 07:20 Birmingham (BHM) 09:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-04 through 2025-11-12
Mon-Thu 07:20 Birmingham (BHM) 09:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-17 through 2025-11-20
Mon-Fri 07:20 Birmingham (BHM) 09:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-02 through 2025-12-11
Mon-Wed 07:20 Birmingham (BHM) 09:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-15 through 2025-12-17
Wed,Thu 07:20 Birmingham (BHM) 09:10 Midway, Chicago (MDW)
Southwest Airlines WN 915 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-24 through 2026-01-01
Mon,Thu,Fri,Sun 16:35 Birmingham (BHM) 18:25 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 16:35 Birmingham (BHM) 18:25 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-11-21 through 2025-11-28
Fri,Sun 16:35 Birmingham (BHM) 18:25 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-12-07 through 2025-12-14
Thu 16:35 Birmingham (BHM) 18:25 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-12-18
Mon 16:35 Birmingham (BHM) 18:25 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2026-01-05
Mon-Wed 17:00 Birmingham (BHM) 18:55 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737-700 (Scimitar Winglets) 1:55 Effective 2025-11-25 through 2025-12-01
Mon,Tue,Fri,Sun 17:00 Birmingham (BHM) 18:55 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737-700 (Scimitar Winglets) 1:55 Effective 2025-12-19 through 2026-01-04
Sun 17:20 Birmingham (BHM) 19:10 Midway, Chicago (MDW)
Southwest Airlines WN 924 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Operates only on 2025-11-30
Mon,Thu,Fri 16:10 Birmingham (BHM) 18:00 Midway, Chicago (MDW)
Southwest Airlines WN 974 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-10-02 through 2025-10-31
Mon,Thu,Fri 07:10 Birmingham (BHM) 09:00 Midway, Chicago (MDW)
Southwest Airlines WN 1556 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Valid until 2025-06-02
Sat 14:35 Birmingham (BHM) 16:25 Midway, Chicago (MDW)
Southwest Airlines WN 1838 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-22 through 2025-11-29
Sat 14:35 Birmingham (BHM) 16:25 Midway, Chicago (MDW)
Southwest Airlines WN 1838 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-20 through 2026-01-03
Mon,Thu,Fri 15:50 Birmingham (BHM) 17:40 Midway, Chicago (MDW)
Southwest Airlines WN 1882 Non-stop Boeing 737-800 (73H) 1:50 Valid until 2025-06-02
Mon-Fri 06:45 Birmingham (BHM) 08:30 Midway, Chicago (MDW)
Southwest Airlines WN 1955 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2025-10-02 through 2025-10-31
Sat 07:00 Birmingham (BHM) 08:50 Midway, Chicago (MDW)
Southwest Airlines WN 1955 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-10-04 through 2025-11-01
Sun 07:10 Birmingham (BHM) 09:00 Midway, Chicago (MDW)
Southwest Airlines WN 1955 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-10-05 through 2025-10-26
Mon,Thu,Fri 18:00 Birmingham (BHM) 19:50 Midway, Chicago (MDW)
Southwest Airlines WN 2521 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-08-07 through 2025-09-29
Tue,Wed 07:25 Birmingham (BHM) 09:15 Midway, Chicago (MDW)
Southwest Airlines WN 2549 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2025-06-04
Sun 10:15 Birmingham (BHM) 12:05 Midway, Chicago (MDW)
Southwest Airlines WN 2549 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2025-05-18
Sun 10:15 Birmingham (BHM) 12:05 Midway, Chicago (MDW)
Southwest Airlines WN 2549 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-06-01
Sat 13:25 Birmingham (BHM) 15:15 Midway, Chicago (MDW)
Southwest Airlines WN 2549 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Valid until 2025-05-31
Sun 18:00 Birmingham (BHM) 19:50 Midway, Chicago (MDW)
Southwest Airlines WN 2909 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-08-10 through 2025-08-24
Sun 18:00 Birmingham (BHM) 19:50 Midway, Chicago (MDW)
Southwest Airlines WN 2909 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-09-07 through 2025-09-28
Mon,Thu,Fri 05:00 Birmingham (BHM) 06:50 Midway, Chicago (MDW)
Southwest Airlines WN 3022 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-06-05 through 2025-07-03
Tue,Wed 05:00 Birmingham (BHM) 06:50 Midway, Chicago (MDW)
Southwest Airlines WN 3022 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-06-10 through 2025-07-30
Mon,Thu,Fri 05:00 Birmingham (BHM) 06:50 Midway, Chicago (MDW)
Southwest Airlines WN 3022 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-07-07 through 2025-08-04
Sun 06:30 Birmingham (BHM) 08:20 Midway, Chicago (MDW)
Southwest Airlines WN 3022 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-06-08 through 2025-08-03
Fri 07:05 Birmingham (BHM) 08:55 Midway, Chicago (MDW)
Southwest Airlines WN 3022 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-07-04
Sat 16:05 Birmingham (BHM) 18:00 Midway, Chicago (MDW)
Southwest Airlines WN 3022 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-06-07 through 2025-08-02
Sat 06:40 Birmingham (BHM) 08:35 Midway, Chicago (MDW)
Southwest Airlines WN 3197 Non-stop Boeing 737-700 (73W) 1:55 Effective 2025-08-09 through 2025-09-27
Mon,Thu,Fri 06:45 Birmingham (BHM) 08:40 Midway, Chicago (MDW)
Southwest Airlines WN 3197 Non-stop Boeing 737-700 (73W) 1:55 Effective 2025-08-07 through 2025-09-29
Ad flat here 8924483383 I FlightInfo Lower
Parallax here BHM-MDW
1 2   next


All airlines flying from Birmingham (BHM) to Midway, Chicago (MDW).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Operates only on 2025-11-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-25 through 2025-12-01
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-10-02 through 2025-10-31
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-20 through 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-10-02 through 2025-10-31
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-10-04 through 2025-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-10-05 through 2025-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Effective 2025-08-09 through 2025-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here BHM-MDW
Page 1 / 2        next
  • A domestic route departing from the Birmingham airport (BHM) and arriving at Midway, Chicago airport (MDW).
  • The flight distance is 570 miles, or 918 km.
  • The timezone of both the departure and the arrival airports is UTC-6 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 1:45 and 1:55.